The Sicagen Solution
Our team of engineers studied the location, building plans, and local climate to guide the material selection process. Materials for this project were picked on the basis of the following criteria:
- Long-term durability
- Ability to withstand high pressure
- Ability to mitigate corrosive elements
- Suitability for use in hot and humid conditions
Based on these parameters, we picked a robust industrial-grade steel to manufacture units of ERW (Electric Resistance Welded) pipes. Timely delivery as per the development phases was critical for SBIOA to avoid a capital block-up. Sicagen delivered a total 565 Tonnes of ERW tubes, worth ₹30 million, in a timely manner.